Diaphragms, bracing and filling: checking gabion bulging
Review basket construction, connections and the filling process together.
Check the basket and connections
Confirm dimensions, diaphragm positions, selvedges and connectors against the selected model and design documents. External dimensions alone do not cover compartments, lacing or connections between baskets.
Review stone filling
Check stone specification, filling sequence, staged placement and bracing against the design and construction plan. Stone placement, face arrangement and restraint need coordinated review; a universal spacing rule cannot replace project instructions.
Keep inspection records
Before and after closing the lid, inspect basket shape, connections and surface condition, and record items needing correction. Site operations and safety follow the approved method and professional supervision.