Bazhong river flood-protection works
Sichuan · Bazhong, Ba River

Project context
The domestic record addresses mountain-river floods, transported stone and scour through stone-filled baskets and flexible connections.
Selection considerations
Review the cross-section, foundation and toe conditions, then confirm basket or mattress structure, connections, corrosion protection and stone requirements against project design documents.
Adapted from Zhongman’s domestic site. Images illustrate applications; supply scope is governed by project records.