Puhe River flood control and drainage, Lot 2
Liaoning · Shenyang, Puhe basin

Project context
The domestic record describes a Puhe flood-control cross-section combining gabion retaining walls with slope mattresses.
Selection considerations
Review the cross-section, foundation and toe conditions, then confirm basket or mattress structure, connections, corrosion protection and stone requirements against project design documents.
Adapted from Zhongman’s domestic site. Images illustrate applications; supply scope is governed by project records.