Songhua River main embankment flood-control works
Heilongjiang · Harbin / Jiamusi

Project context
The domestic record discusses seasonal water-level changes and toe scour on the Songhua River, with stepped gabion toe protection and river-facing slope reinforcement.
Selection considerations
Review the cross-section, foundation and toe conditions, then confirm basket or mattress structure, connections, corrosion protection and stone requirements against project design documents.
Adapted from Zhongman’s domestic site. Images illustrate applications; supply scope is governed by project records.